NCCC Forum

Boards => Club Rides & Events => Topic started by: Nerius Landys on September 14, 2011, 04:37:20 PM

Title: "Pie Ride" this year?
Post by: Nerius Landys on September 14, 2011, 04:37:20 PM
I think we should do Bill's "Pie Ride" before the year ends.  As he described it, I think it requires you to go up South Grade Road, eat some pie at the top, then do Mesa Grande and eat some pie at Dudley's.  I think it's a 100 miler.
Title: Re: "Pie Ride" this year?
Post by: Anthony Smith on September 16, 2011, 02:07:11 PM
Good luck with that ;)
Title: Re: "Pie Ride" this year?
Post by: robert#5639 on September 16, 2011, 10:25:24 PM
Pssh. Let's make it triple pie and go up to Julian for thirds! And as long as we're gonna swing through Julian, let's go down Banner Grade and back around through Ocotillo and up the 8. It might be getting dusk by then so we have to do Kitchen Creek (it's a real treat at night). October sounds good to me.
Title: Re: "Pie Ride" this year?
Post by: wbturek@yahoo.com on September 19, 2011, 10:13:26 AM
I'm down for the 200k version.  Maybe around Thanksgiving?  I'll try to hunt down a route slip.
Title: Re: "Pie Ride" this year?
Post by: Nerius Landys on September 19, 2011, 11:30:32 AM
200 km is absolute max for me.
100 mi is a bit better.
Title: Re: "Pie Ride" this year?
Post by: wbturek@yahoo.com on September 19, 2011, 12:23:54 PM
Ok.  Check this out: http://www.mapmyride.com/routes/view/51202362 (http://www.mapmyride.com/routes/view/51202362). 112 miles from OCRR.  Less if we move the start to Escondido.  I'm game for a Sunday in Oct/Nov.